Wednesday, July 29, 2020

Before the Melaka River barrage was constructed,  Melaka River Cruise can only operate when the river level was high.

This happened only twice a month IE when there was full moon. During this time, there was high tide and the river level raised to allow the boat to operate.

This natural constraint limited the number of cruises can operate each month.



This limitation was a thing of the past once the river mouth barrage was constructed.

Now,  weekend river cruises and hopefully future water taxis can operate daily as a viable river transport system.

Saturday, July 18, 2020

NEW FRIED HOR CHIEN STALL AT KEE ANN ROAD

A new fried oyster stall has opened at Kee Ann road recently.


Kee Ann road is near the Melaka River.

Do come and check this new enterprise.

At night,  Kee Ann road has plenty of car parking lots.


Sunday, July 5, 2020

MALACCA RIVER OVER 150 YEARS

A pictorial record of Malacca River over 150 years.
So many changes have been done for the conservation of the river for our future generations.